Maha Sarakham,, The Director-General of the Royal Irrigation Department and relevant personnel visited the area to monitor the repair of a damaged earthen dam at Huai Chiang Kham Reservoir, Borabue District, Maha Sarakham Province. It is expected that the repair will be completed within 7 days. Mr. Chuchart Rakjit, Director-General of the Royal Irrigation Department, provided information that he had visited the area to monitor the repair of Huai Chiang Kham Reservoir in accordance with the policy of the Minister of Agriculture and Cooperatives to provide assistance to farmers affected by the reservoir. Meanwhile, the Royal Irrigation Department is expediting the repair of the reservoir to provide water for the public to use and store water for use during the dry season. He assured the public that the repair would be completed within 7 days. However, at present, the water level in Huai Chiang Kham Reservoir has dropped below the erosion level of the earthen dam and the process of building a semi-permanent w ater barrier is underway. Source: Thai News Agency
Director-General of the Royal Irrigation Department reveals that within 7 days, the broken reservoir will be repaired.
Bangkok Expands Flood Management to Cover All Districts
September 26, 2026
Floods Sever Key Bridge Route in Sa Kaeo Province
September 26, 2026
Flooding Crisis in Rangsit Canal Due to Rising Water Levels
September 26, 2026
PEA Deploys Teams to Address Power Issues in Flood-Prone Areas
September 26, 2026
Bangkok Residents Face Severe Flooding and Supply Shortages
September 26, 2026